The calculator
Volume (CFT) → Quantity, instantly.
Formula: 1 Volume (CFT) = 1.000000 Quantity
Sponsored · 728×90
What is this calculator?
Calculate sand and aggregate quantities needed for concrete work based on mix ratio and volume.
The conversion formula
1 Volume (CFT) = 1.000000 Quantity
Quick reference
1 Volume (CFT)
1.00 Quantity
2 Volume (CFT)
2.00 Quantity
5 Volume (CFT)
5.00 Quantity
10 Volume (CFT)
10.00 Quantity
¼ Volume (CFT)
0.2500 Quantity
½ Volume (CFT)
0.5000 Quantity
¾ Volume (CFT)
0.7500 Quantity
100 Volume (CFT)
100.00 Quantity
Calculate the exact quantity of sand and aggregate (coarse) needed for your concrete project. Enter volume in CFT or cubic meter and mix ratio to get sand and aggregate in CFT and kg.
Frequently asked questions
How much sand for M20 concrete per cubic meter?
M20 concrete (1:1.5:3) requires approximately 0.42 cubic meters of sand per cubic meter of concrete.
How many CFT of sand per bag of cement?
For M20 mix: approximately 1.5 CFT sand per 50kg cement bag.
What is the difference between M15, M20, M25 concrete?
M15 = 15 N/mm² strength, used for plain concrete. M20 = 20 N/mm², most common for slabs. M25 = 25 N/mm², for heavy structural work.